Deep beneath the towering Swiss Alps lies one of the most incredible engineering feats of the modern age: the Gotthard Base Tunnel (GBT). At an astonishing 57 kilometers (35.4 miles) in length, it is the longest and deepest railway tunnel in the world. This masterpiece of engineering connects northern and southern Europe, cutting travel times and enabling more efficient freight transport. But how did engineers accomplish such an ambitious and daunting task?

This blog explores the methods, technologies, and challenges involved in building the Gotthard Base Tunnel, a project that took nearly two decades to complete and stands as a testament to human ingenuity.

1. The Vision Behind the Gotthard Base Tunnel

The Gotthard Base Tunnel was envisioned as part of Switzerland’s New Rail Link through the Alps (NRLA) project. Its purpose was twofold: to reduce traffic congestion on Swiss roads by encouraging rail freight and to provide a faster, more efficient way for passengers and goods to cross the Alps. By tunneling through the base of the mountains, the project eliminated the need for steep gradients, enabling high-speed rail travel.

The project was formally approved in the 1990s and cost approximately $12 billion to complete. Construction began in 1999, involving over 2,400 workers and requiring the excavation of over 28 million tons of rock.

Sign up to our Newsletter

2. Planning and Preparation

The first step in building a tunnel of this magnitude was thorough planning and surveying. Engineers conducted geological studies to understand the composition and stability of the rock through which the tunnel would pass. The Alps are composed of a mix of solid granite, brittle schist, and sedimentary rock, each requiring different excavation techniques.

Engineers also had to consider seismic activity, groundwater, and the immense pressure exerted by the mountain above. Advanced geological mapping and 3D modeling helped predict challenges and guide the tunnel’s alignment to minimize risks.

 Book-An Introduction to Civil Engineering

3. Tunneling Techniques and Technology

The construction of the Gotthard Base Tunnel involved two primary tunneling methods:

Tunnel Boring Machines (TBMs):
Four massive TBMs, each over 400 meters long, were used to excavate the majority of the tunnel. These machines worked like giant underground factories, simultaneously cutting through rock, removing debris, and lining the tunnel walls with precast concrete segments.

Each TBM was equipped with a rotating cutter head fitted with hardened steel discs capable of slicing through the toughest granite. The machines advanced at an average rate of 20 to 30 meters per day, depending on the rock type.

Drill-and-Blast Method:
For sections where the rock was too hard or fractured for TBMs, engineers employed the traditional drill-and-blast technique. This involved drilling holes into the rock, filling them with explosives, and blasting away the material. Workers then cleared the debris and reinforced the tunnel walls with steel and concrete.

4. Managing Challenges

Building a 57-kilometer tunnel under a mountain came with numerous challenges:

High Temperatures:
At depths of up to 2,300 meters, the rock temperature reached 45°C (113°F). Cooling systems were installed to ensure the safety of workers and equipment.

Groundwater Management:
The Alps are rich in underground water sources. Engineers encountered water pressures of up to 150 bar (equivalent to the pressure 1,500 meters underwater). Advanced drainage systems and reinforced linings were used to manage this pressure and prevent flooding.

Rock Stability:
Different rock types presented unique challenges. In stable granite sections, TBMs worked efficiently, but in fractured or loose rock, additional support was needed. Engineers used steel arches, sprayed concrete, and grouting to stabilize these sections.

Safety:
Safety was a top priority throughout construction. Advanced ventilation systems ensured a constant supply of fresh air, while monitoring systems detected signs of instability. Over the course of construction, nine workers tragically lost their lives, highlighting the inherent dangers of such projects.

5. Innovations and Sustainability

The Gotthard Base Tunnel is not just a marvel of engineering but also an example of sustainable construction. The excavated rock was recycled to produce concrete for tunnel linings, and much of the waste material was used to create artificial islands and habitats.

Automation and advanced monitoring played a crucial role. Sensors embedded in the tunnel continuously monitor its structural integrity, ensuring long-term safety.

The project also prioritized environmental protection. By shifting freight from trucks to trains, the tunnel significantly reduces CO2 emissions, aligning with Switzerland’s commitment to sustainability.

6. The Final Stages: Fitting Out the Tunnel

Once excavation was complete, the focus shifted to equipping the tunnel for rail operations. This involved:

  • Laying Tracks: Precision was key to ensuring smooth and stable rail travel at speeds of up to 250 km/h (155 mph).
  • Installing Ventilation and Cooling Systems: Essential for maintaining safe air quality and temperatures.
  • Communication and Safety Systems: Cameras, emergency exits, and fire suppression systems were installed to ensure passenger safety.

Extensive testing was conducted before the tunnel opened to the public in June 2016.

7. Impact and Legacy

The Gotthard Base Tunnel has transformed European transportation. It has reduced travel times between Zurich and Milan by an hour and increased the capacity for freight trains, easing road congestion.

More importantly, it serves as a symbol of what can be achieved through international collaboration, advanced engineering, and a commitment to sustainability.

Building the 57-kilometer Gotthard Base Tunnel was a monumental challenge, requiring cutting-edge technology, meticulous planning, and the dedication of thousands of workers. It is a triumph of modern engineering and a testament to humanity’s ability to overcome natural barriers.

  • Subscribe to Our Newsletter: Stay updated with the latest insights, tips, and innovations in civil engineering.
  • Check Out These Must-Read Resources:
    • comprehensive book on civil engineering to enhance your understanding of structural design and construction techniques.
    • A captivating book about the lives of great civil engineers, showcasing the pioneers who shaped the modern world.
    • A practical project inspection checklist—an essential tool for every engineer involved in site supervision and quality control.
    • Dive into the genius of the Renaissance with our recommended book about Leonardo da Vinci, exploring his contributions to engineering and architecture.
    • Don’t miss our field notebook and journal, designed specifically for civil engineers and architects to document projects, ideas, and on-site observations

As we face the challenges of a rapidly changing world, projects like the Gotthard Base Tunnel remind us of the power of innovation to connect, protect, and inspire. It’s not just a tunnel through a mountain—it’s a path to a better, more connected future.